Namma Metro

Namma Metro
ನಮ್ಮ ಮೆಟ್ರೋ
Overview
Native name ನಮ್ಮ ಮೆಟ್ರೋ
Owner Bangalore Metro Rail Corporation Ltd. (BMRCL)
Locale Bangalore, Karnataka, India
Transit type Rapid transit
Number of lines 2
Number of stations 30 (current)
41 (Phase I)[1]
Daily ridership 175,000 (September 2016)[2]
Annual ridership 16.8 million (2015-16)
Chief executive Pradeep Singh Kharola (MD)
Headquarters BMTC Complex, K.H. Road, Shanthinagar, Bangalore
Website bmrc.co.in
Operation
Began operation 20 October 2011 (2011-10-20)
Train length 3 coaches (extendable to 6 coaches)
Headway 8–10 minutes
Technical
System length 31.52 km (19.59 mi) (current)
42.3 km (26.3 mi) (Phase I)[3]
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Average speed 34 km/h (21 mph)
Top speed 80 km/h (50 mph)

Namma Metro (literally "Our Metro"), also known as Bangalore Metro, is a metro system serving the city of Bangalore in Karnataka, India. Namma Metro is India's second largest metro system in terms of both length and number of stations, after the Delhi Metro.[4] On the other hand, Namma Metro ranked worlds's 99th largest metro system in terms of length and 92nd largest metro network in terms of number of operating stations. It also contains the first underground metro line in South India.[5] The metro network consists of two colour-coded lines, with a total length of 31.52 kilometres serving 30 stations. The system has a mix of underground, at-grade, and elevated stations using standard-gauge tracks. The metro has an average daily ridership of 175,000 passengers.[6]

The Bangalore Metro Rail Corporation Ltd (BMRCL), a joint venture of the Government of India and the Government of Karnataka, built and operates the Namma Metro.[7] Services operate daily between 06:00 and 22:00 running with a headway varying between 8–10 minutes. The trains are composed of three cars. The power output is supplied by 750 volt direct current through third rail. Namma Metro was the first rail transport system in India to use 750 V DC third rail traction.

The Delhi Metro Rail Corporation Limited (DMRC) prepared and submitted the detailed project for the first phase of the Namma Metro project to the BMRCL in May 2003. Construction work for Phase I of the project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. The project was approved by the Union Cabinet on 25 April 2006. Civil construction on the first section, Reach I, the stretch of the Purple Line between Baiyyappanahalli and Mahatma Gandhi Road, commenced on 15 April 2007. The section opened to the public on 20 October 2011. The development of network was divided into phases, Phase I containing 2 lines was scheduled to be completed in March 2017, and Phase II by 2022.

Network

Timelapse expansion of the Namma Metro network.

Namma Metro is being built in phases. Currently, a portion of Phase I has been completed and is in operation. The operational portion of the Namma Metro is listed below:-

Line Opening date Last extension Stations[8] Length[9]
(km)
Terminals
Purple Line 20 October 2011 30 April 2016 17 18.22 Baiyyappanahalli Mysore Road
Green Line 1 March 2014 1 May 2015 13 13.30 Sampige Road Nagasandra
Total 30 31.52

Purple Line

The first 6.7-kilometre (4.2 mi), 6-station stretch (Reach 1) of the Purple Line between Baiyappanahalli and Mahatma Gandhi Road opened on 20 October 2011,[10] and was the inaugural section of the Namma Metro.[11] The second 6.4-kilometre (4.0 mi), 6-station stretch (Reach 2) of the Purple Line between Mysore Road and Magadi Road opened on 16 November 2015.[12] The first underground section of South India, a 4.8 km stretch from Cubbon Park to Bangalore City Railway Station opened on 29 April 2016, thereby completing the entire 18.22 km Purple Line stretch of the metro network.

Green Line

The first 9.9-kilometre (6.2 mi), 10-station stretch (Reach 3/3A) of the Green Line opened 1 March 2014.[13][14] The stretch connected Sampige Road to Peenya Industry.[15] The second 2.5-kilometre (1.6 mi), 3-station stretch (Reach 3B) of the Green Line, operating between Peenya Industry and Nagasandra, opened 1 May 2015.[16][17]

The Green Line will be the second line of the Metro and when complete it will connect Nagasandra in the north to Putennahalli in the south, covering a distance of 24.2 kilometres (15.0 mi),[3] and serving 24 stations.[8] It will be partly elevated and partly underground, with one station at grade. With the first breakthrough achieved on 20 April 2016 between Sampige Road and Majestic, there is a possibility that a small stretch would be made operational within 3–4 months. However, the southern section of the line, beyond Majestic, will be thrown open to the public for commercial operations by December 2016.

Phase I

The DMRC submitted the DPR for Phase I of the Namma Metro project to the BMRCL in May 2003. The final approval on a scheme that incorporated the expertise of DMRC and RITES Limited did not come until April 2006.[18] The DPR prepared by DMRC envisaged a 33 km (21 mi) elevated and underground rail network with 32 stations for Phase I of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution. In 2007, the BMRCL announced that it would incorporate a northern extension (from Yeshwanthapura to Hesaraghatta Cross) and part of the southern extension (from RV Road to Puttenahalli) in Phase I, thus extending the length of Phase I network to about 42.3 km (26.3 mi), with 41 stations. The objective was to connect the metro to the Outer Ring Road at both ends, and also cover the industrial areas of Peenya in the north-west, thereby providing better connectivity and increasing ridership. In October 2008, the Government of Karnataka approved this extension, which would cost an additional 1,592 crore (US$240 million).[19]

Map of Phase I of the Namma Metro.

Phase I comprises two lines spanning a length of 42.30 kilometres (26.28 mi), of which about 8.82 kilometres (5.48 mi) is underground and about 33.48 kilometres (20.80 mi) is elevated.[3] There are 40 stations in Phase I, of which 8 stations are underground, 1 at grade and 32 are elevated.[20][21] Chief Minister Siddaramaiah informed the Legislative Assembly in January 2016, that the total project cost is expected to be 13,845 crore (US$2.1 billion) due to cost escalation following delays in meeting the deadlines. The delays result in a cost escalation of 4,230 crore (US$630 million).

Line Elevated length (km) Underground length (km) Total length (km) % of length on curves Stations
Purple Line 13.10 4.80 18.22 44.30 % 17
Green Line 20.20 4.00 24.20 39.70 % 24
Total 33.48 8.82 42.30 - 41
Rake interchange line 0 0.35 0.35 100% 0

Implementation of Phase I has been divided into four reaches and two underground sections. The schedule for completion of Phase I is as follows:-

Section Length (km)[9] Termini Opening date
Reach 1 (east) 6.7 Baiyyappanahalli Mahatma Gandhi Road 20 October 2011
Reach 2 (west) 6.4 Mysore Road Magadi Road 16 November 2015 [12][22]
Underground UG2 (east to west) 4.8 Mahatma Gandhi Road Magadi Road 30 April 2016
Reach 3 (north) 5.1 Sampige Road Yeswanthpur 1 March 2014 [14]
Reach 3A (north) 4.8 Yeswanthpur Peenya Industry 1 March 2014 [14]
Reach 3B (north) 2.5 Peenya Industry Nagasandra 1 May 2015 [16][17]
Underground UG1 (north to south) 4.0 Sampige Road (up to Majestic) National College April 2017 [22]
Reach 4 (south) 4.1 National College Rashtreeya Vidyalaya Road April 2017 [23]
Reach 4A (south) 3.9 Rashtreeya Vidyalaya Road Puttenahalli April 2017 [23]

Construction

Construction work for Phase I of the project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006 the Indian Cabinet approved the project, which was then budgeted at more than 5,400 crore (US$800 million) (Later revised to 11,609 crore (US$1.7 billion) for Phase I).[24] In 2006, Navayuga Engineering was awarded the contract to construct Reach 1 of the East-West corridor.[25] The foundation stone for the Phase I construction was laid by Prime Minister Manmohan Singh on 24 June 2006,[26] and civil construction on Reach I of the line, between M.G. Road and Baiyyappanahalli, commenced on 15 April 2007.[27][28] The DPRs for a northern extension (from Yeshwanthapura to Hesaraghatta Cross) and part of the southern extension (from RV Road to Puttenahalli) was submitted in October 2007 and June 2008 respectively.[20]

Underground construction

The underground work of Phase I commenced in May 2011. Each corridor consists of two tunnels, which are the first underground tunnels built for trains in South India. The tunnels, dug using tunnel boring machines (TBM), are located approximately 60 feet below ground level, have a diameter of 5.5 metres and are 5 metres apart.[29][30][31][32][33] [34] A total of 6 TBMs were used for work in the underground section of phase I. They were nicknamed Helen (TBM 1), Margarita (TBM 2), Kaveri (TBM 3), Krishna and Godavari.[35] The UG2 (north to south corridor), from Majestic to K.R Market is expected to finish the entire tunnelling works by August 2016, after which the Green Line would be opened for service, towards the end of the year.

Underground UG1 (east to west corridor) tunneling work was completed on 17 March 2014 after tunnel boring machine Helen (TBM 1) finished its task of tunneling 229m between Bangalore City railway station underground (UG) station and Kempegowda UG station (Majestic). Trackwork and 3rd rail electrification works are completed on the 4.8 km eastbound tunnel of Bangalore metro's Purple line between Cubbon Park and Magadi Road, and the Bangalore Metro Rail Corporation Ltd (BMRCL) began end to end trials on the entire 18.1 km Purple line which stretches from Baiyappanahalli to Mysore Road on 23 Nov 2015.[36] The entire Purple Line stretch was operational on 29 April 2016.

Phase II

The State Government accorded approval vide Order No. UDD 127 BMR 2010 dated 4 January 2011 for preparation of the detailed project report (DPR) for Phase II by the DMRC.[20][37] The high power committee (HPC), in July 2011, gave in-principle clearance to proceed with Phase II.[38] The Karnataka government gave in-principle approval to Phase II of the Namma Metro project on 3 January 2012.[39][40] Phase II was cleared by the expenditure finance committee (EFC) in August 2013.[41] The Union cabinet announced that it has approved plans for phase II on 30 January 2014.[42] The estimated total cost for Phase II is around 26,405 crore (US$3.9 billion).[43] The State Government will contribute 9,000 crore (US$1.3 billion).[44] The project cost of 26,405 is the 2011–12 price level, which it is set to escalate at 5 per cent every year with increasing cost of inputs. The Union government will share that part of cost escalation due to increase in central levies, while the Karnataka State and BMRCL have to bear any other escalation. According to the experts, the total project cost for Phase II is estimated to reach at least 30,000 crore (US$4.5 billion) at the start of construction itself.

Phase II spans a length of 72.095 km – 13.79 km underground, 0.48 km at grade and 57.825 km elevated, and adds 61 stations to the network, of which 12 are underground.[45] Phase 2 includes the extension of the two Phase 1 corridors, as well as the construction of two new lines. The south-end of the Green Line will be extended from Puttenahalli to Anjanapura Township along the Kanakapura Road and the north-end from Hesarghatta Cross to Bangalore International Exhibition Center (BIEC) on Tumkur Road (NH-4). The east-end of the Purple Line will be extended from Baiyappanahalli to Whitefield and the west-end from Mysore Road to Kengeri. A new 18.82 km long fully elevated R V Road – Bommasandra line will be constructed under Phase 2. The second new line is the 21.25 km Gottigere–Nagawara line. The line is mostly underground (13.79 km), but also has a 6.98 km elevated and 0.48 km at-grade sections. There are 18 stations on the line, of which 12 are underground and 6 are elevated.[20]

Phase II consists of extensions for all four reaches of the metro and two new lines.[46][47]

Proposed new lines and extensions to existing lines – under Phase 2
Line Terminals Length New Stations Expected Work Completion date
Purple Line Mysore Road – Kengeri 6.465 km 5 December 2020
Purple Line BaiyyappanahalliWhitefield 15.50 km 13 December 2020
Green Line Puttenahalli – Anjanapura 6.29 km 5 December 2020
Green Line Hesaraghatta Cross – BIEC 3.77 km 3 December 2020
Line 3 R V Road – Bommasandra 18.80 km 16 December 2020
Line 4 Gottigere – Nagawara 21.25 km 18 December 2020
ORR Metro Silk Board – K.R. Puram 17 km 13

Phase 2A

In September 2016, Siddaramaiah announced that a new 17 km long line connecting Silk Board with K.R. Puram would be included in Phase II of the project (categorized as Phase 2A). The line will be called the Outer Ring Road Metro (ORR Metro) and is proposed to have 13 stations - Silk Board, 14th Main Road in HSR Layout, Agara, Iblur Junction, Bellandur, RMZ Ecospace, New Horizon College, Rainbow Hospital, Kadubeesanahalli, Marathahalli, Doddanekundi, Mahadevapura and K.R. Puram. It is estimated to cost 3600 crores.[48] The ORR Metro will have interchange stations with the extended Purple Line at K.R. Puram and with the proposed R V Road – Bommasandra line at Silk Board.[49]

The BMRCL prepared the detailed project report on the proposed line, and submitted the DPR to the state government on 28 October 2016.[50]

Construction

Construction of the second phase will begin after completion of the first phase.[51] On 28 February 2015, the Chief Minister Siddaramaiah said the work will be completed within five years.[52] An estimated 313 heritage trees are planned to be cut down to build Phase II.[53]

The Indian Institute of Science prepared the design for the extension of Reach 1. The BMRCL spent 107 crore (US$16 million) to acquire 57 properties for the extension of Reach 2.[54]

In November 2016, the BMRCL floated tenders for the extension of the Green Line from Nagasandra up to the Bangalore International Exhibition Centre (BIEC). The 3.031 km extension is estimated to cost 247.41 crore. The contract includes the construction of the viaduct, road widening works, and construction of three elevated stations - Manjunathanagar, Jindal and BIEC. The BMRCL estimates that the work will be completed within 27 months from date that construction begins. The BMRCL also began civil work on the southern extension of the Green Line from Puttenahalli to Anjanapura Road (6.29 km) and the western extension of the Purple Line from Mysore Road to Kengeri (8.81 km). Construction work on the Purple Line corridor corridor was awarded in two packages for 660 crore, while the Green Line extension was awarded to Nagarjuna Constructions Company Ltd for 508.86 crore.[55]

Phase II is expected to be completed in 2020.[53]

Phase III

RITES began preparing the feasibility study for Phase III in 2014.[56][57]

Phase III is proposed to have a total length of 127 km. The Phase will include two lines that cover the Outer Ring Road (ORR) on the eastern and western side, and additional lines to connect the lines constructed in the previous two phases. A 33 km line is proposed to cover the eastern portion of the ORR from Silk Board to Hebbal, while a 31.37 km line will cover the western portion of the road. A 21.31 km line linking Hosakerehalli to ORR at Marathahalli passing through Old Airport Road is also proposed to serve the areas of Domlur, Konena Agrahara and HAL. Other proposed lines include a 33-km line from Sarjapur Layout to Yelahanka, passing through Central College, Palace Guttahalli, Mehkri Circle and Hebbal; and an 8.89 km line from Nice Road to Toll Gate (Magadi Road).[58]

There was a proposal to build a 33 km line known as Bangalore High-Speed Rail Link, from MG Road to Bengaluru International Airport (BIA), at a cost of 5,767 crore (US$860 million).[59] Previously, there was plan for an independent body, but later it was decided that BMRC will manage this project.[60] This project has now been scrapped keeping in mind its viability and cost.

In September 2016, RITES suggested nine possible extensions from the existing and proposed metro lines to the airport. The state government invited the public to submit feedback on their preferred route. The nine proposed extensions have an average length of 30 km, and each is estimated to cost between 4,500 crore and 7,000 crore.[61] An extension of the Gottigere – Nagawara line up to the airport emerged as the most popular choice.[62]

Opening

Namma Metro was originally scheduled to begin operations in March 2010. Deadlines for completion were repeatedly missed,[63] and the metro was finally opened to the public on 20 October 2011 by Union Urban Development Minister Kamal Nath.[64] There was an overwhelming response to the metro at the commencement of operations. As per BMRCL sources within first 3 days of operations 169,019 people used this mass transit system.[65] At the end of 4th day about 200,000 passengers had already commuted in Namma Metro. Namma Metro's first 12-day cumulative revenue was 1 crore (US$150,000).[66]

The State Government removed N Sivasailam as MD of Namma Metro on 10 August 2013. He was replaced by Pradeep Singh Kharola.[67][68][69] The Green Line (Reach 3, 3A & 3B) was initially scheduled to be opened for the public by the end of 2012. However, according to the BMRCL, because of the time taken by the Indian Railways to approve works at Swastik Station and Malleswaram 66-metre metro viaduct, the Green Line was expected to open only in April–May 2013. However, the timelines were delayed further.

The line was opened to the public at 6 am on 1 March 2014.[70] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers travelled on the line on opening day.[14] In the first month of operations, 7.62 lakh people at an average of 24,605 people daily used the line, generating a revenue of 1.5 crore (US$220,000). The first underground portion of the East-West Corridor (UG2) commenced operations on 30 April 2016, completing the entire Purple Line stretch.[71]

Finances

Funding

The Union Cabinet approved Phase I of the Namma Metro in April 2006 when it was estimated to cost 5,400 crore (US$800 million). The cost escalated to 13,845 crore (US$2.1 billion) as various problems delayed the completion of the project.[54][72] Land acquisition for Phase I of the project cost 2,500 crore (US$370 million).[54] BMRCL secured 6,500 crore (US$970 million) through long-term loans and 300 crore (US$45 million) by selling bonds, while the remaining project cost was funded by Central Government and the State Government. BMRCL secured loans from several agencies - 3,000 crore (US$450 million) from the Japan International Cooperation Agency (JICA), 600 crore (US$89 million) from the Housing and Urban Development Corporation Limited (HUDCO), 25 crore (US$3.7 million) from the Asian Development Bank (ADB), and the rest from a French lending agency. Approximately 10% of the 6500 crore must be paid as interest by the BMRCL every year. The Federation of Karnataka Chambers of Commerce and Industry estimated that this amounted to an interest payment of 2 crore (US$300,000), however the BMRCL refuted the claims that the interest was that high, while confirming that it was "definitely more than 1 crore (US$150,000) per day."[54]

On 3 January 2012, the Karnataka government approved a budget of 27,000 crore (US$4.0 billion) for Phase II of Namma Metro project.[73] Phase II is estimated to cost 26,405 crore (US$3.9 billion). Land acquisition is expected to cost 5,000 crore (US$740 million).[54] On 27 March 2012, the Asian Development Bank (ADB) signed an agreement to lend $250 million to BMRC to part-finance Phase II of the metro rail project. The loan marked the multilateral lending agency's foray into the urban transport sector in South Asia, the ADB said in a press release. The loan, approved by the ADB Board in March 2011, is the first ADB loan to the urban transport sector without recourse to sovereign guarantees.[74] The State and Central Governments will bear 30% and 20% of the project cost of Phase II respectively. The remaining amount will be obtained through senior term loans.[75]

BMRCL announced plans on 13 June 2013 to issue 10-year bonds.[76] The proposed bonds received a credit rating of "IND AA" from India Ratings & Research (Ind-Ra),[77] a Chennai-based research company.[78] Namma Metro MD N. Sivasailam announced on 3 August 2013 that the issue of bonds would be postponed as the market was volatile. Sivasailam stated that the metro would "be in the market soon and when it is stable."[79]

Revenues

During the first month, since the opening of Reach I, about 1325,000 people travelled by the metro.[80] On average, 41,390 people took the train every day, while the average daily revenue was 667,262. The BMRC earned a revenue of 2.1 crore (US$310,000) in its first month of operation.[81] In the first six months of operation, average ridership went down to 24,968. The BMRC earned a total of 6.6 crore (US$980,000) during the same period.[82] Namma Metro posted a profit of 41 lakh (US$61,000) after almost one year of operating Reach I. BMRCL estimates that nearly 80 lakh passengers travelled on the system, in its first year of operations.[83]

The following table shows the annual ridership and revenue of the Namma Metro since its inception.[84]

Year Passengers Revenue ( crore)
2011-12 4,166,000 6.17 crore
2012-13 6,636,000 8.70 crore
2013-14 7,255,000 9.86 crore
2014-15 11,400,000 17.83 crore
2015-16 16,800,000 28.28 crore

Infrastructure

Purple Line train
Interior of the Metro coach
Interior of the Metro coach on inauguration day
MG Road Station at night

Rolling stock

The specification for rolling stock is based on stainless steel-bodied three-car formations, a trailer between two motored driving units. Internal wide gangways provide ease of passenger movement and assist in load distribution. Trains are air-conditioned throughout with designated space for disability access. Although with many automated functions, trains are under driver control.

Each metro train has three coaches. The BMRC plans to use 6 coach trains from June 2017.[85] The capacity per train is approximately 1,000 through longitudinal seating, giving a high proportion of the floor area to standing passengers. The maximum attainable speed is 80 km/h (50 mph).

Initially the bids by Bombardier and Siemens, Alstom Projects India Ltd and consortium comprising BEML, Mitsubishi and Hyundai Rotem were shortlisted to supply the rolling stock and coaches. In February 2009, the BEML-led consortium was awarded the contract to supply 150 coaches and rolling stock for the first phase of the project. While Mitsubishi would supply the traction for the coaches, Hyundai Rotem would supply the rolling stock and BEML would supply the coaches for Phase I.[86] The first trainset made a trial run in December 2010.[87]

All metro trains are Wi-Fi enabled (the first metro in India to have this feature), so passengers can use laptops, tablets as well as mobile internet.[88] The free Wi-Fi service was made available to commuters on 31 July 2013.[89] Passengers also have emergency voice communication with train staff through a speaker system. Passengers are provided with a call button to communicate anything to the driver or control center during an emergency.[88]

Power supply

Namma Metro was the first rail transport system in India to use 750 V DC third rail traction.[53] In December 2009, the ABB Group was awarded the contract to provide power solutions for the first phase of the planned metro network. ABB designed, supplied, installed and commissioned four substations that receive and distribute electricity, each rated at 66/33 kV, as well as the auxiliary and traction substations. ABB also provided an integrated network management system, or SCADA (Supervisory Control And Data Acquisition), to monitor and control the installations.[90] The BMRC currently pays BESCOM 5.7 per unit of electricity.[91]

In 2016, BMRCL signed an agreement with CleanMax Solar to set up solar installations at Baiyapanahalli and Peenya stations. After Phase II of the metro is complete, CleanMax Solar will set up similar installations at the metro depots in Challaghatta, Whitefield, Kothanur and Hebbagodi. Per the agreement, CleanMax Solar will bear the cost of installation and the BMRC will pay CleanMax a rate of 5.5 per unit of electricity for three years. Following the three year period, all six installations will be transferred to the BMRC. According to the BMRC director of operations NM Dhoke, "The 1.4 MW installation can generate up to 10,000 units, which help power the depot facilities. However, it is not sufficient to power the trains, but it will help us save 51 crore over 25 years on energy."[91]

Signaling

In September 2009, the consortium led by Alstom Project India Limited were awarded a contract worth 563.4 crore (US$83.7 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, Thales Group Portugal S A and Sumitomo Corporation. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase I of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.[92][93]

The integrated control centre at Byappanahalli has direct communication with trains and stations are CCTV fitted with visual and audio service information.[88] Passengers have emergency voice communication with train staff.

Stations

Initially, there were no toilets at Namma Metro stations, despite demand from commuters. BMRCL countered the demand by arguing that constructing toilets was not part of the metro construction plan, and that building toilets in the city was the responsibility of the Bruhat Bengaluru Mahanagara Palike (BBMP). They also justified the decision by saying that commuters spent "hardly five minutes" at stations, so restrooms were not required, and also that none of the Bangalore Metropolitan Transport Corporation (BMTC) bus stops in the city had toilets for passengers. However, BMRCL eventually heeded public demand, and the metro's first toilets were opened at Baiyappanahalli and Indiranagar stations on 21 June 2013.[94]

Mobile and Wi-Fi connectivity

Namma Metro was the first metro system in India to introduce Wi-Fi onboard trains. All trains had Wi-Fi enabled onboard since the opening of the metro.[95] On 24 April 2016, the BMRCL floated tenders to install infrastructure for mobile and Wi-Fi connectivity across all 41 stations in Phase I. Phase I of the Purple Line, including the underground section, is expected to receive coverage by August 2016.[96]

Safety

As of February 2014, BMRCL has two road-cum-rail rescue vehicles that can be used to perform evacuations or re-load derailed trains back onto the track.[97]

The trains are equipped with derailment prevention equipment, and the tracks are equipped with concrete barriers to prevent trains from leaving the viaduct. The support pillars are earthquake proof and are designed to have a lifespan of at least 100 years. Trains are equipped with sensors to detect impending collisions, and have automatic braking systems to prevent speed limits from being exceeded.[98]

Accessibility

Yellow tactile tiles are used at all stations to guide the visually impaired. The tiles start at the ramp and lead to the staircases and lifts.[99] Disabled and elderly passengers can avail a wheelchair at all metro stations. The wheelchair can be used by the passenger to board a train and then dropped off at the destination station.[91]

Rainwater harvesting

BMRCL, in a public-private partnership, harvests rainwater from the viaducts on the rail system. The private partner, Karnataka Rural Infrastructure Development (KRIDL), collects the water at multiple points, treats it, and sells it in bulk as potable water.[100] Around 8 crore litres of water are expected to be collected annually.[101]

BMRCL also plans to harvest rainwater from the 140 acre depot facility at Peenya. Water will be collected from the 190,000 sq foot roof and stored in two tanks with a capacity of 50,000 litres each. Rainwater harvesting is also planned in the existing and under-construction stations. The water harvested will be supplied to places where needed, and any excess will be used for groundwater recharge.[101]

BMRC has installed a water harvesting system along Reach 1 and will be doing the same for Reaches 3 & 4. Installation of flower beds was delayed due to garbage being dumped on the median by garbage collectors, BMRC will also set up flower beds on Reach 1 with assistance from the horticulture department. However, the work related to this has slowed down due to garbage contractors dumping garbage along the median, due to the lack of a waste management plan in the city.[102] BMRC will rejuvenate Kengeri and Veerasandra lakes using water collected from a nearby corridor.[103][104]

Operations

Fare collection

The obverse of an entry token issued
Bangalore Metro Ticket (Token)-Kempegowda Tower Symbol view

MIFARE DESFire platform, developed by NXP Semiconductors, was selected to manage the Automated Fare Collection (AFC) in Namma Metro.[105]

The system uses contactless smart tokens and contactless smart card.[106] Tokens are available only for a single journey.[20] Smart cards can be used for multiple journeys.[20] There are 4 types of smart cards available on the metro – Varshik, Sanchar, Saral and Saraag.[107]

BMRCL began selling tokens through automatic ticket vending machines (ATVMs) on 4 December 2012 at the MG Road, Indiranagar and Baiyyappanahalli stations. The service will eventually be expanded to all metro stations. The touchscreen enabled ATVMs are available in 3 languages – English, Kannada and Hindi. Commuters can purchase a single journey token by selecting the destination station or the amount in the ATVM. They can also add value or add trips to the contactless smart card. Commuters can purchase up to 8 tickets at a time and can get the receipt print for card recharge. ATVMs accept coins of 5 and 10 denominations and 10, 20, 50, 100, 500 and 1,000 denominations of currency notes. However, the ATVM cannot differentiate between 1 and 2 coins.[109][110]

In November 2016, BMRC began accepting online payments to recharge smart cards. Tickets cannot be purchased online.[111]

Approximately 68% of passengers on the metro use smart tokens and 32% use smart cards.[83]

Frequency

The metro service runs between 06:00 and 23:00 hours. There are trains every 8 minutes between 08:00 and 20:00, and every 10 minutes at other times.[112] From 7 November 2016, Purple Line trains began running at an interval of every 4 minutes between 9:10 am and 9:58 am to handle rising passenger traffic during morning peak hours. The headway on the entire system is slated to decrease to once every three minutes after the completion of Phase I.[91] The end-to-end travel time on the Purple Line will be 33 minutes, and on the Green Line will be 44 minutes.

Metro services have occasionally operated beyond 2200 hours. Services are usually extended on festival days or when an international cricket match is held in Bangalore.[113][114]

Ridership

As of September 2016, daily ridership on Namma Metro is 175,000 passengers.[115] The annual ridership in the 2015-16 fiscal year was 16.8 million.

The highest recorded daily ridership on the Namma Metro was 197,928 commuters on 28 July 2016.[116]

Speed

The system is designed for a maximum train speed of 80 km/h. However, the Research Design and Standards Organization (RDSO) fixed the speed at which trains are allowed commercially operate at 67.50 km/h on straight sections, 35 km/h on curves, and 45 km/h in stations.[117]

Laws

The Bangalore Metro Rail (Carriage and Ticket) Rules 2011 limit the weight of personal baggage to 15 kg. Rule 3 says: "No person shall, while travelling in metro railway, carry with him any goods other than a small baggage containing personal belongings not exceeding 60cm x 45cm x 25cm in size and 15kg in weight, except with the prior approval of the metro railway administration." The rules also prohibit carrying explosive, inflammable, and poisonous substances.[118]

The Metro Railway (Operation and Maintenance) Act, 2002, imposes fines and in some cases jail sentences for offences committed on the metro. Anyone indulging in sabotaging the train or maliciously hurting or attempting to hurt other passengers while travelling in the metro can face imprisonment up to 10 years. Pasting posters or drawing graffiti on the walls of stations or trains is punishable by a fine of 1,000 or imprisonment for up to 6 months. Travelling in an inebriated state or creating nuisance in the train is punishable by a 500 fine.[119] Passengers are monitored at security checkpoints and those that are causing trouble, heavily drunk, or carrying forbidden items are not permitted to board.[120] Spitting on the metro premises is punishable by a fine of 100.[121]

Mobile app

The BMRCL launched a Namma Metro app for Android devices in 2013. However, it had limited features.[122] The app was officially re-launched on 4 November 2016 with additional features.[123] The app was developed by the Centre for Development of Advanced Computing (CDAC). The app allows users to purchase and recharge smart cards, locate nearby metro stations and also provides information related to parking, train frequency, route map, and fare details.[91][124]

See also

References

  1. "Metro Phase I Will be Ready by May, to Miss Deadline". The New Indian Express. 22 October 2015.
  2. "Metro's new extended Green Line overtakes Purple Line". Bangaloremirror. Retrieved 29 August 2015.
  3. 1 2 3 "Project Highlights". Official webpage of B.M.R.C. Retrieved 3 May 2010.
  4. "Bengaluru's Namma metro 2nd longest after Delhi metro - The Economic Times". The Economic Times. Retrieved 6 June 2016.
  5. "South India's first underground Metro launch on April 29". The Times of India. Retrieved 26 April 2016.
  6. "Purple Line sees six fold increase in ridership". The Hindu. Retrieved 11 July 2016.
  7. "BMRCL to issue bonds to raise Rs. 500 crore". The Hindu. Chennai, India. 14 June 2013.
  8. 1 2 "Schematic Route Map". Bangalore Metro Rail Corporation Limited. Retrieved 5 June 2015.
  9. 1 2 "Namma Metro: Metro Network". Bangalore Metro Rail Corporation Limited. Retrieved 5 June 2015.
  10. "Namma metro to chug on October 20". IBN Live. 1 October 2011. Retrieved 21 October 2011.
  11. "Namma Metro inaugurated in Bangalore". Railway Gazette International. 24 October 2011. Retrieved 5 June 2015.
  12. 1 2 "Underground metro will be ready to take commuters in 15 days: K J George". Times of India. 19 April 2016. Retrieved 19 April 2016.
  13. "Sampige Road-Peenya Metro Line Inaugurated". The New Indian Express. 1 March 2014. Retrieved 5 June 2015.
  14. 1 2 3 4 "25,000 ride Green line Metro on 1st working day". Deccan Herald. 3 March 2014. Retrieved 5 June 2015.
  15. "Rajajinagar, Peenya residents can smile". The Times of India. 28 November 2011.
  16. 1 2 "Metro Reach 3B to be opened on May 1". Deccan Herald. 24 April 2015. Retrieved 5 June 2015.
  17. 1 2 "Reach 3B of Metro rail flagged off". The Hindu. 1 May 2015. Retrieved 5 June 2015.
  18. http://bmrc.co.in/pdf/phase2/phase2forweb.pdf
  19. "GOK order on Metro Extension" (PDF). Official webpage of B.M.R.C. Retrieved 26 November 2008.
  20. 1 2 3 4 5 6 "Bangalore Metro Rail Project Phase 2" (PDF). http://bmrc.co.in. BMRC. Retrieved 5 June 2015. External link in |website= (help)
  21. "A city begins to fulfill a Metro dream". The Indian Express. 20 October 2011. Retrieved 3 January 2012.
  22. 1 2 "The Metro Rail Guy - A Look Back into the History of Bangalore Metro's Magadi Road – Mysore Line". themetrorailguy.com.
  23. 1 2 "Trial runs of metro in Bengaluru south to begin in September". Bangaloremirror. Retrieved 29 August 2015.
  24. "Indian cabinet approves the project". Online Edition of The Economic Times. 28 April 2006. Archived from the original on 25 June 2007.
  25. "Award of contract" (PDF). Official webpage of B.M.R.C. Archived from the original (PDF) on 28 September 2007. Retrieved 2 October 2011.
  26. "PM lays foundation stone for Metro project". PM office website.
  27. "Bangalore Metro Rail Work to begin on Feb 3, 2007". The Times of India. 21 January 2007. Retrieved 16 October 2007.
  28. "Jaipur Metro completed in record time, but limping in commercial run". The Times of India. Retrieved 29 August 2015.
  29. Rohith B R, Bangalore, 14 Oct 2012, DHNS: (14 October 2012). "Automation helps precise work on metro tunnels". Deccan Herald. Retrieved 4 March 2013.
  30. RohithB R, Bangalore, 13 Oct 2012, DHNS : (13 October 2012). "Metro makes steady inroads". Deccan Herald. Retrieved 4 March 2013.
  31. Special Correspondent (28 September 2012). "A smoother passage for Margarita". The Hindu. Chennai, India. Retrieved 4 March 2013.
  32. Bangalore, 23 Sep 2012, DHNS : (23 September 2012). "Tunnelling along north–south corridor to begin soon". Deccan Herald. Retrieved 4 March 2013.
  33. Update : 06:47 pm IST (18 December 2012). "Metro rushes to meet deadline". Deccan Chronicle. Retrieved 4 March 2013.
  34. Bangalore, 21 Feb 2013, DHNS (21 February 2013). "After Helen, Margarita, it's Krishna and Kaveri". Deccan Herald. Retrieved 4 March 2013.
  35. "2015 to be a milestone year for Namma Metro". Deccan Chronicle. Retrieved 29 August 2015.
  36. "The Metro Rail Guy | Bangalore Metro Begins Full Length Trials on Purple Line from Baiyappanahalli to Mysore Road". Retrieved 2015-11-25.
  37. "State Cabinet approves phase-II of metro". Business Standard. 4 January 2012. Retrieved 6 March 2012.
  38. "Metro project: Cabinet approves two new lines for Phase 2". The Times of India. 4 January 2012.
  39. Bangalore, 4 Jan, DHNS:. "Centre's nod for Phase-II of Metro may take 6 months". Deccan Herald. Retrieved 6 March 2012.
  40. "Cabinet clears Namma Metro Phase 2 – Bangalore – DNA". Daily News and Analysis. 4 January 2012. Retrieved 6 March 2012.
  41. Neha Sethi; Rahul Chandran (2013-09-05). "EFC clears `26,405 cr for Bangalore Metro phase II". Livemint. Retrieved 2013-09-28.
  42. IRJ, 30 Jan; (30 January 2014). "Go-ahead for Bangalore metro phase 2".
  43. "Cities / Bangalore : Frame policy for differential fare pricing, BMRCL told". The Hindu. Chennai, India. 22 February 2012. Retrieved 6 March 2012.
  44. "Underground Bengaluru Metro Station service flagged off, Siddaramaiah seeks Centre's help for Namma Metro phase III | Latest News & Updates at Daily News & Analysis". dna. 29 April 2016. Retrieved 29 April 2016.
  45. "Metro gets poll push for Phase II". Deccan Chronicle. 2013-06-04. Retrieved 2013-09-28.
  46. "Metro project: Cabinet approves two new lines for Phase 2". Times Internet. 4 January 2012. Retrieved 8 September 2014.
  47. "Green signal for Metro's Phase II". The Times of India. 22 February 2012. Retrieved 6 March 2012.
  48. "Metro line from Silk Board to KR Puram to be fast-tracked". The Times of India. Retrieved 18 September 2016.
  49. "Outer Ring Road route may have 13 Metro stations". Deccan Herald. Retrieved 2 November 2016.
  50. "Silk Board-KR Puram Metro link takes a step closer to reality". The Times of India. Retrieved 2 November 2016.
  51. "Second phase of Bangalore Metro project cleared". IBN Live. Retrieved 6 March 2012.
  52. "Sampige Road-Peenya Metro Line Inaugurated". The New Indian Express. 1 March 2014. Retrieved 8 September 2014.
  53. 1 2 3 "Lessons from phase 1: Can Bengaluru Metro beat deadline blues in underground trail? - Firstpost". Firstpost. 27 April 2016. Retrieved 27 April 2016.
  54. 1 2 3 4 5 "Metro June Deadline Stands, But With Rider". The New Indian Express. Retrieved 27 April 2016.
  55. "BMRCL invites bids for 3-km extension from Nagasandra.". Deccan Herald. Retrieved 5 November 2016.
  56. "Underground Bengaluru Metro Station service flagged off, Siddaramaiah seeks Centre's help for Namma Metro phase III". dna. 29 April 2016. Retrieved 29 April 2016.
  57. "Key Metro link opens today, brings east and west closer". Deccan Herald. Retrieved 29 April 2016.
  58. "Namma Metro, a third phase in the making". Deccan Herald. Retrieved 6 June 2016.
  59. "Metro project: Cabinet approves two new lines for Phase 2". The Times Of India. 4 January 2012. Archived from the original on 10 January 2012.
  60. "Metro will have high-speed link to BIA". The Times of India. 21 October 2011.
  61. "Now, suggest a Namma Metro route to the airport". Deccan Herald. Retrieved 18 September 2016.
  62. "Work on underground stretch could delay Metro Phase II too". Deccan Herald. Retrieved 14 October 2016.
  63. "Bangalore Metro misses deadline for 4th time, minister sets Sept 26 as next date : South, News". India Today. 16 September 2011. Retrieved 8 September 2014.
  64. "Metro comes to Bangalore finally". The Times of India. 20 October 2011. Archived from the original on 20 October 2011.
  65. "Revenue Services Report" (PDF).
  66. Madhumathi D.S. "Business Line : Industry & Economy / Logistics : Namma Metro rides on 'gawk' power". Business Line. Retrieved 3 January 2012.
  67. "Namma Metro Man Sivasailam shifted". The Times Of India. 11 August 2013.
  68. News, Express (2013-08-11). "Sivasailam shunted out of BMRCL". The New Indian Express. Retrieved 2013-09-28.
  69. "Pradeep Kharola is new Metro chief - Bangalore - DNA". Dnaindia.com. Retrieved 2013-09-28.
  70. Special Correspondent (2014-02-28). "CM in a hurry, delays Namma Metro launch". The Hindu. Retrieved 2014-03-27.
  71. "Byappanahallimg road metro stretch more popular". The Hindu.
  72. "It's official: Namma Metro Phase-1 not before 2014". Deccan Chronicle. 21 December 2011. Retrieved 3 January 2012.
  73. "Admin approval for Namma Metro Phase II – South India – Karnataka – ibnlive". Ibnlive.in.com. Retrieved 6 March 2012.
  74. "Bangalore Metro gets $250 mn ADB loan". Business Standard. 28 March 2012. Retrieved 25 July 2012.
  75. Bangalore, 17 Oct 2012, DHNS : (17 October 2012). "Centre's nod awaited to extend Metro to Bengaluru Intl Airport". Deccan Herald. Retrieved 4 March 2013.
  76. "B'lore Metro to raise Rs 300 cr via bond issue". Business Standard. 2013-06-11. Retrieved 2013-09-28.
  77. Anil Urs (2013-06-14). "'IND AA (exp)' rating for Bangalore Metro proposed bonds | Business Line". Thehindubusinessline.com. Retrieved 2013-09-28.
  78. "BMRC proves merit in investment ratings". The Times Of India.
  79. "BMRCL defers issue of bonds citing market volatility". The Hindu. Chennai, India. 4 August 2013.
  80. "13.25 lakh rode the Metro – The Times of India". The Times of India. 25 November 2011.
  81. "Namma Metro gains momentum – southindia – Bangalore – ibnlive". Ibnlive.in.com. Retrieved 3 January 2012.
  82. "Joyrides in Bangalore Metro are over – Bangalore – DNA". Daily News and Analysis. Retrieved 25 July 2012.
  83. 1 2 "Bangalore Metro posts Rs 41 lakh profit in first year – Bangalore – DNA". Daily News and Analysis. 18 October 2012. Retrieved 18 October 2012.
  84. Reporter, Staff (20 October 2016). "Metro to complete 5 years of operations". The Hindu. Retrieved 2 November 2016.
  85. http://timesofindia.indiatimes.com/city/bengaluru/BMRC-hoping-to-finish-work-on-Sampige-Road-Puttenahalli-line-ahead-of-April-2017-deadline/articleshow/55252282.cms
  86. "BEML to supply coaches for Bangalore Metro". The Hindu. Chennai, India. 10 February 2009. Retrieved 1 January 2010.
  87. "Railway Gazette: Bangalore metro trial". Retrieved 13 February 2011.
  88. 1 2 3 "NAMMA-METRO-IS-A-GEEK-TRAIN". The Times of India. 16 October 2011. Retrieved 21 October 2011.
  89. "Bangalore Metro goes wi-fi". Deccan Chronicle. 2013-08-01. Retrieved 2013-09-28.
  90. "ABB wins $115 million order to power Bangalore metro". The ABB Group. Retrieved 1 January 2010.
  91. 1 2 3 4 5 "BMRC hoping to finish work on Sampige Road-Puttenahalli line ahead of April 2017 deadline". The Times of India. Retrieved 5 November 2016.
  92. "Alstom will provide train control and signalling system for the new Bangalore metro network in India". Alstom. Retrieved 2 October 2011.
  93. "Alstom-led consortium in pact with Bangalore Metro". Business Standard. 18 September 2009. Retrieved 3 May 2010.
  94. "At Metro, wanna pee? Pay Rs 3 - Bangalore - DNA". Dnaindia.com. Retrieved 2013-09-28.
  95. "NAMMA METRO IS A GEEK TRAIN - Times of India". The Times of India. Retrieved 25 April 2016.
  96. "Mobile Signals to be Strengthened in Metro's Underground Corridor". The New Indian Express. Retrieved 25 April 2016.
  97. Special Correspondent. "BMRCL launches road-cum-rail vehicle for rescue operations". The Hindu. Retrieved 29 August 2015.
  98. "'We've taken steps to ensure public safety'". The Times of India. 28 October 2011.
  99. G. Ananthakrishnan (14 January 2013). "Linking modes of commute". The Hindu. Chennai, India. Retrieved 4 March 2013.
  100. "'Liquid' cash from viaduct". The Hindu. Chennai, India. 15 December 2011.
  101. 1 2 Francis, Merlin (2 April 2012). "Namma Metro gets waterwise". DNA India. Bangalore, India. Retrieved 24 June 2012.
  102. "Metro medians turn garbage dumps". The Times Of India. 6 August 2012.
  103. "Lakes to come alive along Metro path". The Times of India. 4 November 2012. Retrieved 4 March 2013.
  104. "BMRCL plans to rejuvenate lakes, starting with Kengeri – Bangalore – DNA". Daily News and Analysis. 4 November 2012. Retrieved 4 March 2013.
  105. "Bengaluru Metro System Adopts NXP's MIFARE Technology". MarketWatch. Retrieved 6 March 2012.
  106. "Bangalore Metro: Recharge and ride on". The Times of India. 1 January 1970. Retrieved 21 October 2011.
  107. "Cities / Bangalore : 20,000 smart cards sold for metro ride". The Hindu. Chennai, India. 17 October 2011. Retrieved 21 October 2011.
  108. "20,000 smart cards sold for metro ride". The Hindu. 17 October 2011. Retrieved 8 September 2014.
  109. Bangalore, 3 Dec 2012, DHNS : (3 December 2012). "Automatic ticket vending at Metro stations". Deccan Herald. Retrieved 4 March 2013.
  110. "Yeshwantpur Metro link work picks up pace". The Times of India. 5 December 2012. Retrieved 4 March 2013.
  111. "BMRCL launches online system to top up Metro cards". Deccan Herald. Retrieved 18 November 2016.
  112. "Namma metro may up frequency". The New Indian Express. Retrieved 6 June 2016.
  113. Bangalore, 22 Dec 2012, DHNS: (22 December 2012). "Bar timings relaxed for revellers". Deccan Herald. Retrieved 6 June 2013.
  114. "Metro to run till midnight today, tomorrow". The Times of India. 24 December 2012. Retrieved 6 June 2013.
  115. "Metro's new extended Green Line overtakes Purple Line". Bangaloremirror. Retrieved 29 August 2015.
  116. "Namma Metro records 2nd highest ridership". The New Indian Express. Retrieved 5 November 2016.
  117. Chethan Kumar, Bangalore, 22 May 2013, DHNS: (22 May 2013). "RDSO in no hurry to allow Metro to up speed". Deccan Herald. Retrieved 6 June 2013.
  118. "Metro gets luggage scanners". Deccan Herald.
  119. Rohith B R, Bangalore, 18 Oct 2012, DHNS : (18 October 2012). "Commuters' brush with etiquette on Namma Metro". Deccan Herald. Retrieved 6 June 2013.
  120. "No entry for drunk commuters in Metro". Deccan Chronicle. 25 December 2012. Retrieved 6 June 2013.
  121. "Not fine to spit in Metro". The Times of India. 11 October 2012. Retrieved 6 June 2013.
  122. "New app for Namma Metro once Phase 1 gets fully operational". Deccan Herald. Retrieved 29 August 2015.
  123. http://www.deccanherald.com/content/579445/metro-trial-run-national-college.html
  124. "'Unofficial' apps of govt transport corpns flood digital platform". Deccan Herald. Retrieved 2 November 2016.
Wikimedia Commons has media related to Namma Metro.
This article is issued from Wikipedia - version of the 11/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.